Wednesday, July 20, 2011

Week 15.5

We had a chance to get together and knock out some cabinet work this past weekend. We were really productive and the cabinet is getting pretty close to being built now and we'll be moving on to the control panel soon.

We got the back bottom panel attached and it turns out that we had a "scrap" piece that was the exact right size for the removable access panel on the back:




We installed some magnetic cabinet latches to hold the removable panel in place. We used 4 of them, one in each corner:




Installed a knob to take that panel off and put it back on. This is a chrome knob which should pretty closely match my t-molding:



On the front, we got the coin door mounted and the front panel attached:




And we cut out the slots in the speaker shelf:





It is really coming together. Next steps are... mount the speaker shelf, make a hole in the back to run the power cord in and out, mount some admin buttons on top of the cabinet, and move on to building the control panel!

No comments:

Post a Comment